10-Story Interior Demolition
Santa Ana, CA
The story
AWS completed the interior demolition of a 10-story building while one tenant was still present — and while construction crews installing new tenant improvements worked side by side with our workers.
Starting on the top floor, the crew used hand labor to remove all previous tenant improvements from each 10,000 sq ft floor: ceilings, partition walls, carpeting and floor covering. When the tenant on the 7th floor needed more time to move, the crew skipped from the 8th floor to the 6th, and finished the 7th floor last.
The building also required asbestos abatement — in floor tile, pipe insulation and some drywall mud — and proper recycling of fluorescent bulbs and PCB ballasts. AWS recycled all the metal studs and ceiling grid and most of the doors and wood sheeting, protected the lobby’s marble floors with Masonite, and held safety meetings every few days.
“When we finally left the site, you would have never known we had been there … except for the fact that we completed the job quickly, safely, and competently.”
— Dick Dadourian, President
Original photos from the current site are small; higher-resolution photos to be added.
Projects like this.
Have a project like 10-Story Interior Demolition? Tell us about it and we’ll prepare a bid.
One contractor, start to finish.
Owners, general contractors and property managers: tell us about your abatement or demolition project and we’ll prepare a bid.